page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14 page 15
< prev - next > Transport and infrastructure Animal transport KnO 100392_The Donkey Cart and Ambulance (Printable PDF)
Manufacturing the donkey cart and ambulance
Diagram 17. Cross sectional view from the front of the cart
Practical Action
Roof support (Part J)
Diagram 13 a) 10 mm
clearance hole (Plan
10mm
10mm
Ambulance side
Frame (Part B)
Wire mesh (Part F)
Wood support
(Part B)
10 mm ΓΈ
clearance hole
Wood
(Part H)
3. The two roof supports need to be hammered round to form the oval shape
shown in the diagram. This is done using the same process as described in Part
1.1.
4. Insert the two roof supports into the holes made in the frame and weld in
place.
5. The cotton material is then cut to size and is pulled over the roof supports
and tied in place.
6. Following this the ambulance frame is lifted up on to the cart frame and with
the 4 bolt holes lined up, insert the 12 mm bolts and tighten their respective
nuts.
7. The ambulance is complete please see diagram 18.
14